Sunday, June 11, 2006

One week later and the second floor and roof is almost done (the loft-bonus room remains).

Front of house. Tyvek is up and roof is getting there.

From inside of garage looking through to the back of the house.

From living room looking out the back of the house (great wall is visible).

From front door looking into foyer/living room.

Garage. The door(?) opening on the left should not be there. Concrete pad is done.

Kitchen island area. Should not be the same height on the left.

From kitchen/breakfast area looking into family room and master bedroom.

From front-right. Again the garage door is a mystery :).

Sunday, June 04, 2006

One month later and we now have something that resembles the first floor of our house.

Front-right.


Rear. Living room windows/fireplace opening and master bedroom on the right.


From the front of the driveway.


Back-right. Kitchen / breakfast bay window.


Front-left. Garage: single-car stall seems to be 1-2feet higher(?), slight alignment issue at nearest corner with wood and brick

Sunday, May 07, 2006

New House Progress

After three weeks, the footers have been poured and foundation work has begun.

Front left, where the garage will be.


Back left, master bedroom.


Back right, kitchen, breakfast area and patio.

Front right, portch and front door.

Sunday, April 16, 2006

New House Progress

Initial lot clearing. The lot extends up to 60' from the back (grey) buildings.


From the street/start of the driveway.


From the (future) car pad looking to the back.


From the carpad to the front of the lot. (Well is in the middle left)