Sunday, April 16, 2006

New House Progress

Initial lot clearing. The lot extends up to 60' from the back (grey) buildings.


From the street/start of the driveway.


From the (future) car pad looking to the back.


From the carpad to the front of the lot. (Well is in the middle left)

No comments:

Post a Comment